色播婷婷电影综合社区,AV女优不卡亚洲在线,99999AV,日韩人妻中文字幕视频,国产拍自偷,91人人妻,超碰在线81,免费福利视频一区,九草青草原在线看

China 10-meter long foldable assembled flood control sub-dike - China Supplier
China 10-meter long foldable assembled flood control sub-dike - China Supplier China 10-meter long foldable assembled flood control sub-dike - China Supplier China 10-meter long foldable assembled flood control sub-dike - China Supplier China 10-meter long foldable assembled flood control sub-dike - China Supplier China 10-meter long foldable assembled flood control sub-dike - China Supplier

10-meter long foldable assembled flood control sub-dike

Price:¥1 /套
Industry Category:
Product Category:
Brand: 冀虹
Spec: WX-2013


Contact Info
  • Add:長安區(qū)東勝廣場B座1008, Zip:
  • Contact: 趙佳娜
  • Tel:15533661522
  • Email:

Other Products

Description
Additional Information

I. Purpose of Hebei Five-Star Power Equipment Co., Ltd.'s Flood Control Sub-Dike
[Five-Star] Assembled Panel Dam Flood Control Sub-Dike is mainly used for emergency flood control and overflow prevention on soft and hard embankments such as sandy loam, loam, clay, concrete, and asphalt.
II. Main Features of the Flood Control Sub-Dike
The [Five-Star] Assembled Panel Dam Flood Control Sub-Dike from Hebei Five-Star Power Equipment Co., Ltd. is a new, fast, cost-effective, and environmentally friendly disaster prevention and mitigation device that breaks through traditional thinking modes and abandons traditional dike-building materials and processes. It features water control through water utilization, high efficiency and speed; flexible dam assembly and strong adaptability; easy storage and transportation with low cost; recyclable and reusable, green and environmentally friendly.
III. Main Specifications of the Assembled Panel Dam Flood Control Sub-Dike
1. Sub-dike dimensions: 1.2 m * 10 m;
2. Sub-dike unit width: 1 m;
3. Applicable embankment types: sandy loam, loam, clay/concrete, asphalt;
4. Sub-dike height: 1.30/1.35 m;
5. Water retention height: 1.0 m;
6. Original embankment top width: 4.0 m or more;
7. Safety factor k: 2.0-3.35;
8. Design wind speed: 6.0 m/s;
9. Design river width/wave height: 4 km/0.3 m;
10. Gross weight: 260 kg;
11. Net weight: 225 kg;
12. Construction speed: 60 minutes for 100 people/km
IV. Structural Principle of the Assembled Panel Dam Flood Control Sub-Dike
1. Structure and Function of the [Five-Star] Assembled Panel Dam Flood Control Sub-Dike
The [Five-Star] Assembled Panel Dam Flood Control Sub-Dike mainly consists of two parts:
(1) Sub-dike support angle frame: Made of aluminum alloy profiles connected by shafts, it is directly installed behind the water-retaining panel using a rotating shaft. It can be folded together with the panel when not in use and quickly deployed as the support framework of the dam body when needed. Beam connecting rod: Made of aluminum alloy square materials connected with special joints, it serves as the connecting support member of the dam body.
(2) Foldable water-retaining panel: The exclusively developed foldable water-retaining panel uses connecting shafts to link multiple panels into an integrated unit. When not in use, several panels can be folded together to save space. When deployed, they can be instantly unfolded to enhance assembly speed. The foldable water-retaining panel is made of corrugated fiberglass material or specially treated color steel plates, aluminum alloy plates, and waterproof PVC plates, which are connected to the beam as a whole through special fixing devices. Its functions: first, as a connecting piece to link adjacent angle frames to form the load-bearing carrier of the dam body; second, as a rigid connecting plate. The bottom of the panel is equipped with positioning fixing piles, formed from round steel. Depending on the embankment foundation, there are two usage methods: when applied to soft embankment foundations, it is inverted in the trench to resist displacement; when applied to hard embankment foundations, it serves to position, retain water, prevent seepage, and compact the water-sealing elastomer.
V. Working Principle of Hebei Five-Star Power Equipment Co., Ltd.'s Assembled Panel Dam Flood Control Sub-Dike
The [Five-Star] Assembled Panel Dam Flood Control Sub-Dike adopts the principle of panel dams in hydraulic engineering. It connects and fastens multiple components such as angle frames, beams, and foldable water-retaining support panels to form a rigid sub-dike body. The water-retaining support panel functions as the water-retaining panel in a panel dam. 

Industry Category
Product Category
Brand: 冀虹
Spec: WX-2013
Stock: 999
Manufacturer:
Origin: China / Hebei / Shijiazhuangshi
About Toocle.com - Partner Programme - Old Version
Copyright ? Toocle.com. All Rights Reserved.
(浙)-經(jīng)營性-2023-0192
ChatGlobal Chat Now 射阳县| 安徽省| 锦州市| 胶州市| 冀州市| 五河县| 嘉荫县| 建始县| 新昌县| 台前县| 台中县| 苍南县| 伽师县| 阿克| 嵩明县| 文水县| 安顺市| 抚顺县| 禄丰县| 稻城县| 昌都县| 定边县| 泸西县| 迭部县| 额尔古纳市| 偏关县| 南安市| 左权县| 长葛市| 崇明县| 兰坪| 富锦市| 太湖县| 洪雅县| 黎城县| 玉树县| 临潭县| 依安县| 金门县| 阜平县| 台州市|