色播婷婷电影综合社区,AV女优不卡亚洲在线,99999AV,日韩人妻中文字幕视频,国产拍自偷,91人人妻,超碰在线81,免费福利视频一区,九草青草原在线看

China Steel Cable Tray Powder Coating - China Supplier
China Steel Cable Tray Powder Coating - China Supplier

Steel Cable Tray Powder Coating

Price:Negotiable
Industry Category: Hardware & Tools/Electric Cutting Tools/Drill Bit
Product Category:
Brand:
Spec:


Contact Info
  • Add:揚中市三茅街道創(chuàng)業(yè)南路16號, Zip: 212200
  • Contact: 朱經(jīng)理
  • Tel:0511-88332814
  • Email:1427901080@qq.com

Other Products

Description
Additional Information


Fiberglass reinforced plastic (FRP) cable trays refer to cable ladders, cable trays, and metal wire ducts. FRP cable trays are mainly made of steel, aluminum alloy, and fiberglass reinforced plastic. The surface treatment of FRP cable trays includes painting, powder coating, electro-galvanizing, hot-dip galvanizing, and electrostatic powder spraying. The installation of cable trays mainly involves installation along the ceiling, horizontal and vertical installation along walls, installation along shafts, installation along the ground, and installation along cable trenches and pipe supports. The supports (hangers) used for installation can be either pre-fabricated or custom-made. The fixing methods for supports (hangers) mainly include welding on pre-embedded iron parts and expansion bolt fixation. The installation of steel cable trays must comply with the following regulations:
1. When the length of a straight steel cable tray exceeds 30m, or the length of an aluminum alloy or FRP cable tray exceeds 15m, expansion joints should be installed. Compensation devices should be set at building deformation joints for FRP cable trays.
2. Hangers or supports should be installed at the following locations for FRP cable trays:
2.1 At both ends of the cable tray joint, 0.5m from each end;
2.2 At intervals of 1.5 to 3m;
2.3 At turns;
2.4 Every 1.5 meters for vertical cable trays.
3. Hangers and supports should be installed vertically, neatly, and firmly, without any tilting.
4. Bolts on the cable tray connection plate should be tightly fastened without omission, and nuts should be located on the outside of the tray.
5. Cable trays should be laid below flammable and explosive gas pipelines and thermal pipelines.
6. Metal cable trays and their supports should be grounded or connected to zero at no fewer than two points along their entire length.
7. Connection plates between metal cable trays should have no fewer than two locking nuts or lock washers at both ends, and a copper grounding wire with a cross-section of no less than 4mm2 should be connected across both ends.
8. The installation of cable trays should meet the following requirements:
8.1 The left-right deviation of the cable tray should not exceed 50mm;
8.2 The horizontal deviation per meter of the cable tray should not exceed 2mm;
8.3 The vertical deviation of the cable tray should not exceed 3mm.
9 Steel cable trays should be installed below flammable and explosive gas pipelines and thermal pipelines. When there are no design requirements, the minimum clear distance from pipelines should comply with relevant regulations.

Industry Category Hardware & Tools/Electric Cutting Tools/Drill Bit
Product Category
Brand:
Spec:
Stock:
Origin:
About Toocle.com - Partner Programme - Old Version
Copyright ? Toocle.com. All Rights Reserved.
(浙)-經(jīng)營性-2023-0192
ChatGlobal Chat Now 公主岭市| 无为县| 尤溪县| 邢台市| 介休市| 扎兰屯市| 江阴市| 韶山市| 封丘县| 安徽省| 大田县| 阳朔县| 黑山县| 浦江县| 海兴县| 大港区| 寻乌县| 蓬安县| 衡阳市| 黑河市| 唐海县| 化州市| 丰宁| 崇信县| 五河县| 凤城市| 海阳市| 赞皇县| 连州市| 浦县| 长治市| 扎囊县| 安徽省| 苏尼特右旗| 澄迈县| 眉山市| 灌阳县| 武胜县| 英吉沙县| 婺源县| 文登市|