色播婷婷电影综合社区,AV女优不卡亚洲在线,99999AV,日韩人妻中文字幕视频,国产拍自偷,91人人妻,超碰在线81,免费福利视频一区,九草青草原在线看

China Shield synchronous grouting material for subway shield segment synchronous grouting - China Supplier
China Shield synchronous grouting material for subway shield segment synchronous grouting - China Supplier China Shield synchronous grouting material for subway shield segment synchronous grouting - China Supplier China Shield synchronous grouting material for subway shield segment synchronous grouting - China Supplier

Shield synchronous grouting material for subway shield segment synchronous grouting

Price:¥55 /m
Industry Category: Metallurgy & Minerals/Metal Wires and Ropes/Other Metal Wire, Rope
Product Category:
Brand: 中大恒建
Spec: 20


Contact Info

Other Products

Description
Additional Information

A dry mixture processed from graded dry aggregates, cementitious materials, fillers, admixtures, etc., used for shield grouting engineering.

Shield synchronous grouting material, when mixed with water in a certain proportion and stirred into a uniform slurry, is used alone or with supporting components for backfill grouting behind the shield. Its purpose is to effectively control ground settlement during shield construction, ensure the early stability of the segment lining, and form the first line of defense for lining waterproofing.

I. Product Features

1. High fluidity and excellent filling performance.

2. Cures within a specified time and is not diluted by groundwater before curing.

3. Construction is not restricted by site conditions, with simple procedures, allowing parallel work with other trades, easy operation, and fast construction speed.

II. Scope of Application

Tunnel shield construction, rail transit, stations, etc.

III. Performance Indicators

Note: Shield synchronous grouting material complies with the standard: DB11T 1608-2018 "Technical Specification for Application of Ready-Mixed Shield Grouting Material".

IV. Construction Process

1. During grouting, the shield tail gap should be completely filled and compacted, with a filling coefficient not less than 1.3.

2. The grouting pressure should match the ground stress at the burial depth of the tunnel axis, and the pressure should be uniform.

3. Type I slurry (thin slurry) should be used up within the apparent setting time, and Type II slurry (thick slurry) should be used up within the initial setting time.
Winter Construction

1. Comprehensive measures should be taken during winter construction to ensure slurry quality, and a suitable winter construction plan should be in place.

2. Fluid pipelines such as water tanks and water pipes matched with the mixing machine should be insulated.

3. The slurry pipelines from the mixing machine to the storage tank, as well as the storage tank itself, should be insulated.

4. During winter construction, after each operation, water in equipment and pipelines should be drained promptly to avoid freezing and damaging the equipment.

Industry Category Metallurgy & Minerals/Metal Wires and Ropes/Other Metal Wire, Rope
Product Category
Brand: 中大恒建
Spec: 20
Stock: 19
Manufacturer:
Origin: China / Beijing / Tongzhouqu
About Toocle.com - Partner Programme - Old Version
Copyright ? Toocle.com. All Rights Reserved.
(浙)-經(jīng)營(yíng)性-2023-0192
ChatGlobal Chat Now 满洲里市| 自贡市| 开鲁县| 平乡县| 和龙市| 延川县| 普宁市| 盐城市| 科技| 屯留县| 宁乡县| 邯郸市| 阿拉善右旗| 出国| 荥经县| 濉溪县| 佛坪县| 富裕县| 红原县| 苍溪县| 辛集市| 若尔盖县| 屯昌县| 虹口区| 汶上县| 台湾省| 海兴县| 镇安县| 巴马| 越西县| 鄂托克旗| 肥西县| 彝良县| 锦州市| 鄂托克旗| 临朐县| 孟津县| 平利县| 大城县| 长沙市| 伊宁市|