色播婷婷电影综合社区,AV女优不卡亚洲在线,99999AV,日韩人妻中文字幕视频,国产拍自偷,91人人妻,超碰在线81,免费福利视频一区,九草青草原在线看

China Construction and Installation of Bathing, Steam Rooms, and Saunas - China Supplier
China Construction and Installation of Bathing, Steam Rooms, and Saunas - China Supplier China Construction and Installation of Bathing, Steam Rooms, and Saunas - China Supplier China Construction and Installation of Bathing, Steam Rooms, and Saunas - China Supplier

Construction and Installation of Bathing, Steam Rooms, and Saunas

Price:¥199 /㎡
Industry Category: Sports & Entertainment
Product Category:
Brand: 鞍山中野汗蒸設(shè)備
Spec: 鞍山中野汗蒸房桑拿房


Contact Info
  • Add:沈陽市鐵西區(qū)興順街99號, Zip:
  • Contact: 周鋼
  • Tel:15998823135
  • Email:1304239360@qq.com

Other Products

Description
Additional Information

Anshan Sauna Room, Haicheng Bath and Sauna Room, Taian Fire Dragon Bath, Xiuyan Beauty Salon Sauna

Detailed Construction Process of Anshan Sauna Room
I. Preliminary Planning and Design
Site Selection and Space Assessment
Applicable Scenarios: Residential use (3-8㎡), commercial use (15-50㎡), or comprehensive wellness centers (requires integration with SPA and shower areas).
Basic Requirements: Ceiling height ≥2.3 meters, wall load-bearing capacity ≥150kg/㎡, independent electrical circuit (220V/380V), pre-installed drainage system.
Avoid proximity to water sources, gas pipelines, or wooden structures (additional fireproofing treatment required).
Type Selection and Functional Design
Mainstream Types:
Far-infrared sauna room (heated by far-infrared light wave tubes/far-infrared heating cables, temperature 40-60°C)
Salt therapy sauna room (Himalayan salt bricks + negative ion system)
Jade sauna room (laid with Xiuyan jade/maifan stone, magnetic therapy function)
Smart Configuration: Automatic temperature and humidity control.
II. Material and Equipment Procurement
Core Material List

Category Recommended Material Technical Parameters
Insulation Layer Extruded Polystyrene Board (XPS) Thickness ≥2cm, Fire Rating B1
Heating System Far-infrared Light Wave/Alloy Heating Cables Power 450-550W/㎡, IP67 Waterproof
Decorative Surface Fir/Pine (Residential Use), Salt Bricks Moisture Content ≤12%, Formaldehyde-Free


Auxiliary Equipment

Electrical System: Leakage Protection Circuit Breaker (30mA operating current), Thermal Fuse (automatic cutoff at 70°C).
III. Construction Process (Using Far-Infrared Sauna Room as an Example)
Foundation Construction Phase (3-5 days)
Insulation Layer Installation: XPS board splicing, protective layer installation.
Circuit Pre-embedding: Zoned wiring for the heating system (each zone ≤8㎡), reserve junction boxes for temperature controllers.
Main Installation Phase (7-10 days)
Heating System Installation: Heating system setup, protective base layer installation.
Decorative Work: Sauna exterior finishing (leave 2mm expansion gaps), salt brick walls require fixed wooden frames.
Equipment Integration: Smart constant temperature control system, infrared temperature sensors (error ±2°C).
IV. Debugging and Acceptance Standards
Functional Testing
Heating Test: Room temperature rises from 20°C to 55°C; it may be slightly slower immediately after construction, please be patient.
Safety Inspection: Insulation resistance measured with a megohmmeter ≥50MΩ, leakage current <0.75mA.
Energy Efficiency Evaluation: Continuous operation for 8 hours consumes ≤15 kWh (standard 10㎡ room).
V. Operation and Maintenance Key Points
Daily Management
Ventilate by opening the door after daily use to release moisture.
Wipe decorative surfaces monthly with a slightly damp cloth.

Industry Category Sports & Entertainment
Product Category
Brand: 鞍山中野汗蒸設(shè)備
Spec: 鞍山中野汗蒸房桑拿房
Stock: 18
Manufacturer:
Origin: China / Liaoning / Anshanshi
About Toocle.com - Partner Programme - Old Version
Copyright ? Toocle.com. All Rights Reserved.
(浙)-經(jīng)營性-2023-0192
ChatGlobal Chat Me 湘西| 金平| 西城区| 河南省| 康保县| 略阳县| 孟连| 图们市| 隆安县| 靖西县| 定陶县| 常山县| 太保市| 鲁山县| 辽阳县| 阿图什市| 施秉县| 兰西县| 新田县| 高阳县| 屏南县| 普格县| 吴忠市| 九江市| 灌阳县| 福泉市| 渭源县| 河间市| 高安市| 丰城市| 寿光市| 孝感市| 鄯善县| 简阳市| 基隆市| 即墨市| 三都| 全南县| 察隅县| 五寨县| 汝阳县|