色播婷婷电影综合社区,AV女优不卡亚洲在线,99999AV,日韩人妻中文字幕视频,国产拍自偷,91人人妻,超碰在线81,免费福利视频一区,九草青草原在线看

China Construction and Installation of Sauna and Steam Rooms - China Supplier
China Construction and Installation of Sauna and Steam Rooms - China Supplier China Construction and Installation of Sauna and Steam Rooms - China Supplier China Construction and Installation of Sauna and Steam Rooms - China Supplier

Construction and Installation of Sauna and Steam Rooms

Price:¥199 /㎡
Industry Category: Sports & Entertainment
Product Category:
Brand: 錦州中野汗蒸設(shè)備
Spec: 錦州中野汗蒸設(shè)備


Contact Info
  • Add:沈陽市鐵西區(qū)興順街99號, Zip:
  • Contact: 周鋼
  • Tel:15998823135
  • Email:1304239360@qq.com

Other Products

Description
Additional Information

Jinzhou Sauna Room, Beizhen Beauty Salon Sauna, Heishan Fire Dragon Bath, Yi County Tourmaline, Linghai Electric Heated Kang

Detailed Construction Process of Jinzhou Sauna Room
I. Preliminary Planning and Design
Site Selection and Space Assessment
Applicable Scenarios: Home use (3-8㎡), commercial use (15-50㎡), or comprehensive wellness centers (requires integration with SPA and shower areas).
Basic Requirements: Ceiling height ≥2.3 meters, wall load-bearing capacity ≥150kg/㎡, independent electrical circuit (220V/380V), pre-installed drainage system.
Avoid proximity to water sources, gas pipelines, or wooden structures (additional fireproofing required).
Type Selection and Functional Design
Mainstream Types:
Far-infrared sauna rooms (heated by far-infrared light wave tubes/far-infrared heating cables, temperature 40-60°C)
Salt therapy sauna rooms (Himalayan salt bricks + negative ion system)
Jade sauna rooms (paved with Xiuyan jade/maifan stone, magnetic therapy function)
Smart Configuration: Automatic temperature and humidity control.
II. Material and Equipment Procurement
Core Material List

Category Recommended Material Technical Parameters
Insulation Layer Extruded Polystyrene Board (XPS) Thickness ≥2cm, Fire Rating B1
Heating System Far-infrared Light Wave/Alloy Heating Cables Power 450-550W/㎡, IP67 Waterproof
Decorative Surface Fir/Pine (Home Use), Salt Bricks Moisture Content ≤12%, No Formaldehyde Emission


Auxiliary Equipment

Electrical System: Leakage Protection Circuit Breaker (30mA operating current), Thermal Fuse (automatic cutoff at 70°C).
III. Construction Process (Taking Far-Infrared Sauna Room as an Example)
Foundation Construction Phase (3-5 days)
Insulation Layer Installation: XPS board splicing, protective layer installation.
Circuit Pre-embedding: Zoned wiring for heating system (each zone ≤8㎡), reserve junction box for thermostat.
Main Installation Phase (7-10 days)
Heating System Installation: Heating system setup, protective base layer installation.
Decoration Work: Sauna exterior finishing (leave 2mm expansion gap), salt brick walls require wooden frame fixation.
Equipment Integration: Smart constant temperature control system, infrared temperature sensor (error ±2°C).
IV. Debugging and Acceptance Standards
Functional Testing
Heating Test: Room temperature rises from 20°C to 55°C; slightly slower immediately after construction, please be patient.
Safety Inspection: Insulation resistance measured with megohmmeter ≥50MΩ, leakage current <0.75mA.
Energy Efficiency Assessment: Continuous operation for 8 hours consumes ≤15 kWh (standard 10㎡ room).
V. Operation and Maintenance Key Points
Daily Management
Open the door after daily use to release moisture.
Wipe the decorative surface monthly with a slightly damp cloth.

Industry Category Sports & Entertainment
Product Category
Brand: 錦州中野汗蒸設(shè)備
Spec: 錦州中野汗蒸設(shè)備
Stock: 999
Manufacturer:
Origin: China / Liaoning / Jinzhoushi
About Toocle.com - Partner Programme - Old Version
Copyright ? Toocle.com. All Rights Reserved.
(浙)-經(jīng)營性-2023-0192
ChatGlobal Chat Me 东阿县| 阿拉善左旗| 朔州市| 泗洪县| 内丘县| 扎鲁特旗| 新密市| 乌拉特后旗| 留坝县| 鹤峰县| 甘德县| 岳阳县| 时尚| 来安县| 留坝县| 达拉特旗| 澄迈县| 华亭县| 黎城县| 漠河县| 诸城市| 鹤峰县| 封开县| 罗江县| 米脂县| 德钦县| 库尔勒市| 如东县| 朝阳市| 顺平县| 静宁县| 南部县| 象州县| 嵊泗县| 洞头县| 碌曲县| 台安县| 蒙阴县| 渝北区| 尖扎县| 汪清县|