色播婷婷电影综合社区,AV女优不卡亚洲在线,99999AV,日韩人妻中文字幕视频,国产拍自偷,91人人妻,超碰在线81,免费福利视频一区,九草青草原在线看

China Sauna Room Construction and Installation - China Supplier
China Sauna Room Construction and Installation - China Supplier China Sauna Room Construction and Installation - China Supplier China Sauna Room Construction and Installation - China Supplier

Sauna Room Construction and Installation

Price:¥199
Industry Category: Sports & Entertainment
Product Category:
Brand: 長(zhǎng)春中野汗蒸設(shè)備
Spec: 長(zhǎng)春中野汗蒸設(shè)備


Contact Info
  • Add:沈陽(yáng)市鐵西區(qū)興順街99號(hào), Zip:
  • Contact: 周鋼
  • Tel:15998823135
  • Email:1304239360@qq.com

Other Products

Description
Additional Information

Changchun Sauna Room, Dehui Beauty Sauna Spa, Jiutai Fire Dragon Bath, Yushu Tourmaline, Nongan Bathing and Sauna

Detailed Construction Process of Changchun Sauna Room
1. Preliminary Planning and Design
Site Selection and Space Assessment
Applicable Scenarios: Residential (3-8㎡), Commercial (15-50㎡), or Comprehensive Wellness Centers (requires integration with SPA and shower areas).
Basic Requirements: Ceiling height ≥2.3 meters, wall load-bearing capacity ≥150kg/㎡, independent electrical circuit (220V/380V), pre-installed drainage system.
Avoid proximity to water sources, gas pipelines, or wooden structures (additional fireproofing required).
Type Selection and Functional Design
Mainstream Types:
Far-infrared Sauna Room (heated by far-infrared light wave tubes/far-infrared heating cables, temperature 40-60°C)
Salt Therapy Sauna Room (Himalayan salt bricks + negative ion system)
Jade Sauna Room (paved with Xiuyan jade/maifan stone, magnetic therapy function)
Smart Configuration: Automatic temperature and humidity control.
2. Material and Equipment Procurement
Core Material List

Category Recommended Material Technical Parameters
Insulation Layer Extruded Polystyrene Board (XPS) Thickness ≥2cm, Fire Rating B1
Heating System Far-infrared Light Wave/Alloy Heating Cables Power 450-550W/㎡, IP67 Waterproof
Decorative Surface Fir/Mongolian Scotch Pine (Residential), Salt Bricks Moisture Content ≤12%, Formaldehyde-Free


Auxiliary Equipment

Electrical System: Leakage Protection Circuit Breaker (30mA operating current), Thermal Fuse (automatic cutoff at 70°C).
3. Construction Process (Taking Far-infrared Sauna Room as an Example)
Foundation Construction Phase (3-5 days)
Insulation Layer Installation: XPS board splicing, protective layer setup.
Circuit Pre-embedding: Zoned wiring for heating system (each zone ≤8㎡), reserve junction box for thermostat.
Main Installation Phase (7-10 days)
Heating System Installation: Heating system setup, base layer protection.
Decoration Work: Sauna exterior finishing (leave 2mm expansion gap), salt brick walls require wooden龍骨 fixation.
Equipment Integration: Smart constant temperature control system, infrared temperature sensor (error ±2°C).
4. Debugging and Acceptance Standards
Functional Testing
Heating Test: Room temperature rise from 20°C to 55°C, may be slightly slower immediately after construction, please wait patiently.
Safety Inspection: Insulation resistance ≥50MΩ measured with megohmmeter, leakage current <0.75mA.
Energy Efficiency Assessment: Continuous operation for 8 hours consumes ≤15 kWh (standard 10㎡ room).
5. Operation and Maintenance Key Points
Daily Management
Ventilate by opening the door after daily use to release moisture.
Wipe decorative surfaces monthly with a slightly damp cloth.

Industry Category Sports & Entertainment
Product Category
Brand: 長(zhǎng)春中野汗蒸設(shè)備
Spec: 長(zhǎng)春中野汗蒸設(shè)備
Stock: 999
Manufacturer:
Origin: China / Jilin / Changchunshi
About Toocle.com - Partner Programme - Old Version
Copyright ? Toocle.com. All Rights Reserved.
(浙)-經(jīng)營(yíng)性-2023-0192
ChatGlobal Chat Me 磐安县| 南和县| 乃东县| 阜南县| 三明市| 濮阳县| 高密市| 九龙坡区| 惠州市| 郸城县| 陇西县| 普定县| 色达县| 平潭县| 海晏县| 广汉市| 正安县| 惠州市| 长岭县| 红桥区| 陇南市| 惠州市| 南和县| 上饶市| 曲水县| 米林县| 内黄县| 曲松县| 客服| 封丘县| 鄱阳县| 双柏县| 泰州市| 特克斯县| 陆丰市| 邢台市| 襄樊市| 延寿县| 营口市| 乐山市| 正蓝旗|